PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing ductwork raisers at the 1st floor Facing North.jpg Laying out block at Intake Facing West.jpg Motorized dampers.jpg Elevator 1,2,3 steel guide rails at the 2nd floor Facing West.jpg Exterior Framing at the 1st floor Facing North.jpg Installing copper piping at the 3rd floor Facing North-West.jpg Installing Exterior framing at the 1st Floor Facing North.jpg Installing weather strips at the curtain wall Facing South.jpg Installing weather strips throughout the Curtain Wall South Elevation.jpg
Previous pageNext page Exterior Framing at the 1st floor Facing North
Exterior Framing at the 1st floor Facing North